
MANUFACTURING AND INSTALLATION OF A FLAG-TYPE CRANE
OF DIFFERENT CAPACITY AND DESIGN
Manual or electric hoists are also installed, as well as rail beams for the safe and efficient movement of materials.
The entire process includes structure fabrication, industrial painting, assembly, and functional testing to ensure safety and performance in industrial environments.

Jib crane structure under construction. The freshly painted components are visible, ready for on-site assembly.

Technicians maneuvering the main beam, ready for installation. The enclosed environment with active utilities requires precise and careful execution to avoid interfering with operations in the administrative area.

The team makes the final adjustments from the scaffolding, ensuring alignment and secure attachment. The column is now anchored to the ground and the boom is in position.

The main column is already fixed to the floor, while staff work from scaffolding to anchor the top part to the ceiling with a reinforcing plate.

The structure is firmly anchored to both the floor and ceiling, maximizing the use of available space without obstructing the work area. The chain hoist is ready for use.

Another similar project.
